With work now progressing well, we should be able to start landscaping and revegetation works along the rear of the site. A site inspection is planned with our Landscape Consultant after which it is hoped we will be able to purchase plants and commence planting. Frontage landscaping works will be held off until after building construction works have been completed.
Work is also underway to satisfy our Environmental Offset requirements at Bli Bli. Under council supervision, we have had several days of weed removal and expect to start planting the first stage in late October. Council is organising a Community Planting Day on Sunday 28 October. It is proposed that local community groups and local residents will assist us in the planting of many trees. It would be good if we can get as many members as possible to help on that day.
Buderim Men’s Shed is a not for profit community group of some 300 members, mainly retired men, who presently operate out of temporary premises at 53 Mill Road, Buderim. Members’ interests span an extensive range of activities, including woodwork, wood turning, toy making, woodcarving, metal work, gardening, art and sketching, computing, french polishing, leatherwork, library and book group, men’s health and well being, music, and leadlighting.
Due to the temporary nature of our occupancy and the inability to find a suitable permanent home on Buderim, the State Government granted us a long term lease over a 1.1 ha portion of the old quarry site in Advance Road at Kuluin on which to construct a new purpose-built complex. This will also allow us to increase our support for other community groups in the region, both by providing greater assistance where required and disability accessible meeting rooms.
On-site car parking for 56 vehicles. Underground stormwater drainage and extensive landscaping will also be provided.
Due to financial constraints, the building construction will need to be staged. Stage 1 will consist of the construction of the workshop and studio as these are basic, 30m x 12m, metal framed and clad buildings. Stage 2 will comprise of the more complex administration building.
Evansbuilt, another local construction company, will undertake Stage 1 works for us once the civil works by Shadforths have been completed.
Temporary administration activities will be carried out in part of the studio building until stage 2 can be constructed.
It is proposed at this time that much of the fit out will be undertaken by Men’s Shed members.